|
Our Role: Cost Management |
Full refurbishment of listed offices totalling 25,000 sq ft.
The work included the strip out of the existing building back to shell and the full replacement of all fit-out up to Cat A.
The central core was reconstructed with a new staircase and 2 new lifts and a new atrium, the rear mews building was converted into three high specification apartments. |